Importnat Inofrmation



Caution: This site fully independent from the Oman Air and not represented in any way..

 




 
Awards

Oman Air VirtualPIREP - Flight # OMA223

Flight Details
Flight No.: OMA223 Aircraft: B737-81M (A4O-BR) Flight Time: 02.08 Date: 08/26/2018
Departure / Arrival
Departure: Muscat International Airport
Departure ICAO: OOMS
Arrivals: Cochin International Airport
Arrival ICAO: VOCI
Route Flown: EMURU M300 CLC
Pilot In Command / PIREP Status
PIC: Fahad A.salaam PIREP: Accepted
Other Flight Log Informations

smartCARS version 2.1.31.0, 2018/8/26 UTC
[10:31:57] Preflight started, flying on IVAO
[10:31:57] Flying Boeing 737-8FZ NGX OMAN AIR
[10:36:37] Pushing back with 19964 lb of fuel
[10:37:03] Fuel quantity increased to 23031 lb from 19964 lb
[10:38:01] Engine 1 is on
[10:39:04] Engine 2 is on
[10:39:47] Flaps set to position 1
[10:41:29] Taxiing to runway
[10:45:47] Taking off
[10:46:16] Climbing, pitch: 7, roll: 1 degrees right, 180 kts
[10:46:20] Gear lever raised at 88 ft at 191 kts
[10:48:04] Flaps set to position 0 at 6849 ft at 193 kts
[11:07:52] Cruising at 37000ft, pitch: 2, 454 kts
[12:52:46] Simulator connection reestablished, 36988 feet above, 458 from before
[12:52:46] Aircraft changed to Aircreation582SL redMAN AIR
[12:52:46] Gear lever lowered
[12:52:46] Touched down early at 0 fpm, gear level: down, flaps: 0
[12:52:46] Landed in 0 ft, fuel: 59 lb, weight: 599 lb
[12:52:46] Taxiing to gate
[12:52:46] The flight may now be ended
[12:52:46] Taxi time was less than 15 seconds
[12:52:47] Arrived, flight duration: 02:08

Flight Remarks/Comments


Fahad A.salaam - fatal error

Mohammed Al-Yousafi - Good landing
Revenue from this Virtual Flight
Gross Revenue: $ 118, 742.76
(162 load / $ 732.98 per unit)
If revenue is $ 0, it means this flight was not a scheduled Oman Air Virtual flight. There for gross revenue were unable to calculate.
Fuel Cost: $ 25, 876.50
(19905 fuel used @ 1.3 / unit)
If cost is $ 0, it means this flight was not a scheduled Oman Air Virtual flight. There for fuel cost were unable to calculate.